
sump-level pump bay
Tirnach Unit 80 Original
USD 2364.77 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 177 metres
- Floor area 612 square metres
- Occupancy 38 people
- Session length 1 hours
About this item
This listing is a sump-level pump bay listed with depth below grade 177 metres, floor area 612 square metres, occupancy 38 people. Its remaining stated figures are session length 1 hours, session fee set after acceptance, access route hoist cage. Every one of them is quoted from the same six axes the other listings in this category are described on.
Specifications
| depth below grade | 177 metres |
|---|---|
| floor area | 612 square metres |
| occupancy | 38 people |
| session length | 1 hours |
| session fee | 2364.77 dollars |
| access route | hoist cage |
Product at a glance
- depth below grade
- 177 metres
- floor area
- 612 square metres
- occupancy
- 38 people
- session length
- 1 hours
- session fee
- 2364.77 dollars
- access route
- hoist cage
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 118 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- RMRuben Melle★★★★★
2026-07-19Floor area of 612 square metres was the deciding figure
Second sump-level pump bay we have run; this listing replaced an older one. Its floor area of 612 square metres is what settled it. The rest of this listing specification did not enter into the decision.
- CKCormac Kestrel★★★★★
2026-07-16Depth below grade at 177 metres, as listed
Went through the whole sump-level pump bay catalogue twice before this listing. The stated depth below grade is 177 metres, which is the figure we were checking. We never looked at the other axes once 177 metres checked out.
- JIJosip Ilkka★★★★★
2026-07-15Still happy with this listing
Have had this listing in service long enough to say something useful about this sump-level pump bay. This listing has been in service long enough that we would buy it again. Worth knowing before you commit to this listing.
- KPKatrin Pehrson★★★☆☆
2026-07-07Where this listing falls short
We looked at most of the sump-level pump bay listings before settling on this listing. Nothing about this listing is quick to service; plan the access before you site it. None of that would stop us buying this listing again.
- THToma Halvard★★★★★
2026-07-06Ours is not a heavy-duty use for this listing
Shortlisted three sump-level pump bay units and this listing was the one we kept. We run this listing on a single site rather than across a fleet, and it suits that. That is the whole of it, on this listing at least.
- MOMarta Ostrem★★★★☆
2026-07-041 hours was the requirement
This listing is our third sump-level pump bay and the first one specified properly. What decided it was the session length at 1 hours. Would choose this listing again on the same grounds.
- BRBram Rask★★★★★
2026-06-26Getting this listing running
Replaced a much older sump-level pump bay with this listing last season. This listing arrived ready to run, which is not what we expected. Others may weigh it differently, but this listing suits us.




