
sump-level pump bay
Tirnach Unit 80 GEO-StatisticsAddition
USD 2322.3 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 177 metres
- Floor area 612 square metres
- Occupancy 38 people
- Session length 1 hours
About this item
Every one of them is quoted from the same six axes the other listings in this category are described on.
Specifications
| depth below grade | 177 metres |
|---|---|
| floor area | 612 square metres |
| occupancy | 38 people |
| session length | 1 hours |
| session fee | 2322.3 dollars |
| access route | hoist cage |
Product at a glance
- depth below grade
- 177 metres
- floor area
- 612 square metres
- occupancy
- 38 people
- session length
- 1 hours
- session fee
- 2322.3 dollars
- access route
- hoist cage
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 118 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- RMRuben Melle★★★★★
2026-07-19Floor area of 612 square metres was the deciding figure
Second sump-level pump bay we have run; this listing replaced an older one. Its floor area of 612 square metres is what settled it, representing a 25% increase in operational space compared to our previous unit. The rest of this listing specification did not enter into the decision.
- CKCormac Kestrel★★★★★
2026-07-16Depth below grade at 177 metres, as listed
Went through the whole sump-level pump bay catalogue twice before this listing. We never looked at the other axes once 177 metres checked out.
- JIJosip Ilkka★★★★★
2026-07-15Still happy with this listing
Worth knowing before you commit to this listing.
- KPKatrin Pehrson★★★☆☆
2026-07-07Where this listing falls short
We looked at most of the sump-level pump bay listings before settling on this listing. Nothing about this listing is quick to service; plan the access before you site it, as average maintenance time is 20% longer due to the hoist cage route. None of that would stop us buying this listing again.
- THToma Halvard★★★★★
2026-07-06Ours is not a heavy-duty use for this listing
Shortlisted three sump-level pump bay units and this listing was the one we kept. That is the whole of it, on this listing at least.
- MOMarta Ostrem★★★★☆
2026-07-041 hours was the requirement
This listing is our third sump-level pump bay and the first one specified properly. What decided it was the session length at 1 hours, which aligns with our operational cycle that repeats every 60 minutes. Would choose this listing again on the same grounds.
- BRBram Rask★★★★★
2026-06-26Getting this listing running
Replaced a much older sump-level pump bay with this listing last season. This listing arrived ready to run, which is not what we expected, reducing our setup time by 30%. Others may weigh it differently, but this listing suits us.




