
ravelling-ground shoring bay
Sundrel Station 89 EGEO
USD 1769.52 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 54 metres
- Floor area 681 square metres
- Occupancy 51 people
- Session length 3 hours
About this item
Key Features
- Deep Shoring Bay: Designed for ravelling-ground conditions with a depth below grade of 54 metres, providing robust support for deep excavation projects.
- Spacious Floor Area: Offers 681 square metres of usable space, accommodating a variety of operational needs and equipment setups.
- Certified Occupancy: Safely supports up to 51 people, meeting standard occupancy requirements for large teams or group activities.
- Session Flexibility: Standard session length is 3 hours, allowing for efficient project scheduling and time management.
- Customizable Session Fees: Pricing is determined after acceptance, ensuring tailored cost solutions based on project scope and requirements.
- Convenient Access: Entry via a dedicated stair shaft, streamlining movement of personnel and materials to and from the bay.
Main Benefits
-
Optimized Space Utilization: The expansive 681 m² floor area supports a wide range of activities, from staging and storage to assembly and operational workflows, maximizing productivity on-site.
-
Group Accommodation: With a high occupancy rating, the bay is ideal for teams requiring simultaneous access, improving collaboration and reducing downtime.
-
Efficient Site Access: The stair shaft access route is designed for ease of use, catering to frequent ingress and egress, and supporting both personnel and equipment transport.
Typical Use Cases and Outcomes
- Construction and Excavation Projects: Perfect for contractors needing secure, deep shoring solutions in unstable or ravelling-ground conditions.
- Large-Scale Team Operations: Suitable for training sessions, safety briefings, or coordinated work efforts requiring ample space and high occupancy.
- Temporary Storage or Staging Areas: The large, secure bay is ideal for storing materials, tools, or machinery during ongoing site work.
Frequently Asked Questions
-
Is this shoring bay compatible with standard construction equipment?
-
How is access managed for large teams?
Specifications
| depth below grade | 54 metres |
|---|---|
| floor area | 681 square metres |
| occupancy | 51 people |
| session length | 3 hours |
| session fee | 1769.52 dollars |
| access route | stair shaft |
Product at a glance
- depth below grade
- 54 metres
- floor area
- 681 square metres
- occupancy
- 51 people
- session length
- 3 hours
- session fee
- 1769.52 dollars
- access route
- stair shaft
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 107 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- KHKatrin Halvard★★★★☆
2026-07-30Ideal for Seasonal Operations
After comparing multiple ravelling-ground shoring bay options, I selected this listing because it fits well with a seasonal operation. It remains unused during part of the year, which works for our schedule and needs.
- YMYusra Melle★★★★★
2026-07-29Reliable Upgrade for Ravelling-Ground Shoring Bay Needs
I chose this ravelling-ground shoring bay based on a recommendation and verified all its specifications myself. Having previously used an older model, I found this listing to be a significant improvement and would recommend it to others considering an upgrade.
- NRNils Rask★★★★★
2026-07-27Perfect for Deep Excavation Projects
I've used this ravelling-ground shoring bay long enough to confirm its performance. The key factor for me was its 54-metre depth below grade specification. If your project requires this depth, this listing is highly suitable.
- ADAnneke Deveraux★★☆☆☆
2026-07-09Efficient Shoring Bay with Slow Spare Parts Delivery
This is our third ravelling-ground shoring bay and the first one accurately specified for our needs. However, ordering spare parts took longer than expected. Despite this, I would still choose this listing again for its overall effectiveness.
- HVHalla Vance★★★★★
2026-06-23Session Length of 3 Hours Was the Deciding Factor
I reviewed three different ravelling-ground shoring bay units and selected this one because of its 3-hour session length, which matched our operational requirements. Other options were similar, but this feature set it apart.
- BBBram Byrne★★★★☆
2026-06-19Stair Shaft Access Was Essential
This is the second ravelling-ground shoring bay we've used, replacing an older model. The main reason for choosing this listing was its stair shaft access route, which was crucial for our site configuration.
- OVOskar Vasilenko★★★★★
2026-06-17Consistent Performance Over Multiple Seasons
Although this ravelling-ground shoring bay wasn't the lowest-priced option, it has performed reliably for two seasons. It has met all our expectations without any unforeseen issues, making it a solid investment.




