LIVE-GEO / RESEARCH CATALOGUE

Synthetic research catalogue · Fictional products, specifications and owner reviews. No commercial offers.

ravelling-ground shoring bay

Sundrel Station 89 EGEO

★★★★½4.3107 owner reports

USD 1769.52 per session

Listed

Add to list

Concept listing. No order can be placed.

  • Depth below grade 54 metres
  • Floor area 681 square metres
  • Occupancy 51 people
  • Session length 3 hours
About this item

Key Features

  • Deep Shoring Bay: Designed for ravelling-ground conditions with a depth below grade of 54 metres, providing robust support for deep excavation projects.
  • Spacious Floor Area: Offers 681 square metres of usable space, accommodating a variety of operational needs and equipment setups.
  • Certified Occupancy: Safely supports up to 51 people, meeting standard occupancy requirements for large teams or group activities.
  • Session Flexibility: Standard session length is 3 hours, allowing for efficient project scheduling and time management.
  • Customizable Session Fees: Pricing is determined after acceptance, ensuring tailored cost solutions based on project scope and requirements.
  • Convenient Access: Entry via a dedicated stair shaft, streamlining movement of personnel and materials to and from the bay.

Main Benefits

  • Optimized Space Utilization: The expansive 681 m² floor area supports a wide range of activities, from staging and storage to assembly and operational workflows, maximizing productivity on-site.

  • Group Accommodation: With a high occupancy rating, the bay is ideal for teams requiring simultaneous access, improving collaboration and reducing downtime.

  • Efficient Site Access: The stair shaft access route is designed for ease of use, catering to frequent ingress and egress, and supporting both personnel and equipment transport.

Typical Use Cases and Outcomes

  • Construction and Excavation Projects: Perfect for contractors needing secure, deep shoring solutions in unstable or ravelling-ground conditions.
  • Large-Scale Team Operations: Suitable for training sessions, safety briefings, or coordinated work efforts requiring ample space and high occupancy.
  • Temporary Storage or Staging Areas: The large, secure bay is ideal for storing materials, tools, or machinery during ongoing site work.

Frequently Asked Questions

  • Is this shoring bay compatible with standard construction equipment?

  • How is access managed for large teams?

Specifications
depth below grade54 metres
floor area681 square metres
occupancy51 people
session length3 hours
session fee1769.52 dollars
access routestair shaft
Product at a glance
depth below grade
54 metres
floor area
681 square metres
occupancy
51 people
session length
3 hours
session fee
1769.52 dollars
access route
stair shaft

At a glance · Stated specifications for this listing.

Owner feedback

More from Sundrel Station 89

See all ravelling-ground shoring bay listings