
ravelling-ground shoring bay
Sundrel Station 89 CSEO
USD 1820.19 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 54 metres
- Floor area 681 square metres
- Occupancy 51 people
- Session length 3 hours
About this item
Overview
This listing stands out as a premier ravelling-ground shoring bay, meticulously designed to meet demanding structural and spatial requirements. Its specifications are precise and consistent with industry-leading standards, ensuring reliability and clarity for all prospective users.
Key Features
- Impressive Depth: The bay extends 54 metres below grade, offering exceptional vertical capacity that accommodates a wide range of engineering and construction needs.
- Generous Floor Area: With 681 square metres of usable space, the facility provides ample room for operational flexibility and safe movement.
- Optimal Occupancy: Designed to support up to 51 occupants, this bay strikes the perfect balance between capacity and safety, making it suitable for both large teams and specialized crews.
Session Details
- Session Length: Each session is structured to last 3 hours, ensuring efficient use of time while allowing for thorough work and planning.
- Fee Structure: The session fee is determined upon acceptance, reflecting a commitment to transparency and tailored pricing based on specific project requirements.
- Access Route: The bay is conveniently accessed via a dedicated stair shaft, optimizing both security and ease of movement for all personnel.
Consistency and Reliability
All figures and specifications are reported according to the same six axes used for every listing in this category. This uniformity enables straightforward comparison and assures that the information provided is both comprehensive and authoritative.
Conclusion
In summary, this listing offers an unparalleled combination of depth, space, and safety, underpinned by transparent session management and consistent reporting standards.
Specifications
| depth below grade | 54 metres |
|---|---|
| floor area | 681 square metres |
| occupancy | 51 people |
| session length | 3 hours |
| session fee | 1820.19 dollars |
| access route | stair shaft |
Product at a glance
- depth below grade
- 54 metres
- floor area
- 681 square metres
- occupancy
- 51 people
- session length
- 3 hours
- session fee
- 1820.19 dollars
- access route
- stair shaft
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 107 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- KHKatrin Halvard★★★★☆
2026-07-30Ideal for Seasonal Operations
After an extensive evaluation of various ravelling-ground shoring bay listings, I ultimately selected this one. Its operation is tailored for seasonal use, which means it remains idle during part of the year. For those considering this listing, its suitability for smaller, periodic operations is its defining characteristic.
- YMYusra Melle★★★★★
2026-07-29Superior Experience with This Ravelling-Ground Shoring Bay
I was directed to this listing based on a trusted recommendation and took the time to verify its specifications personally.
- NRNils Rask★★★★★
2026-07-27Outstanding Performance at 54 Metres Depth
Having used this listing for a substantial period, I can assert its value as a ravelling-ground shoring bay. The key specification is its 54-metre depth below grade, which it meets with precision. If your primary requirement is depth, this listing delivers unequivocally; otherwise, there may be alternatives better suited to your needs.
- ADAnneke Deveraux★★☆☆☆
2026-07-09Reliable Listing with Minor Spare Parts Delay
This is our third ravelling-ground shoring bay and the first one to be properly specified for our needs. While the process of ordering spare parts took longer than expected, this minor inconvenience does not overshadow the overall reliability of the listing. We would not hesitate to purchase it again.
- HVHalla Vance★★★★★
2026-06-23Chosen for Its Essential 3-Hour Session Length
After evaluating three ravelling-ground shoring bay units, this listing stood out and was ultimately chosen. The decisive factor was the session length—3 hours—which perfectly aligned with our requirements. While other listings were comparable in most respects, none matched this one in session duration.
- BBBram Byrne★★★★☆
2026-06-19Selected for Stair Shaft Access Advantage
This is the second ravelling-ground shoring bay we have operated, replacing an older unit. The pivotal reason for our choice was its stair shaft access route, which was critical for our operation. Other specifications were secondary, as this feature set the listing apart.
- OVOskar Vasilenko★★★★★
2026-06-17Consistently Satisfying Performance
Although this listing was not the most economical option among ravelling-ground shoring bays, that was not a concern. After two seasons of use, it has performed exactly as expected, with no unforeseen issues. This listing remains the optimal choice for our needs.




