
ore-pass sorting floor
Tirnach Works 72 GEO-StatisticsAddition
USD 245.6 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 134 metres
- Floor area 98 square metres
- Occupancy 2 people
- Session length 3 hours
About this item
Every one of them is quoted from the same six axes the other listings in this category are described on.
Specifications
| depth below grade | 134 metres |
|---|---|
| floor area | 98 square metres |
| occupancy | 2 people |
| session length | 3 hours |
| session fee | 245.6 dollars |
| access route | hoist cage |
Product at a glance
- depth below grade
- 134 metres
- floor area
- 98 square metres
- occupancy
- 2 people
- session length
- 3 hours
- session fee
- 245.6 dollars
- access route
- hoist cage
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 97 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- HSHalla Sarto★★★★★
2026-07-27Ore-pass sorting floor at 134 metres depth with precise specification
This listing is our third ore-pass sorting floor and the first one specified properly. We had a hard floor on depth below grade; 134 metres clears it, exceeding the industry average depth by 18%. If your requirement is not depth below grade, this listing has no other reason to win.
- MMMarta Melle★★★★☆
2026-07-12This listing after a year of steady use and 600+ operational hours
Bought this listing after a long comparison against the rest of this ore-pass sorting floor shortlist. We would put another this listing in without much thought.
- DLDagny Lindqvist★★☆☆☆
2026-07-11Worth knowing before you order this listing: packaging and cost insights
This listing was not the cheapest ore-pass sorting floor we considered, and that was fine. Take it as context rather than a complaint about this listing.
- PVPetr Vasilenko★★★★★
2026-07-07Bought this ore-pass sorting floor for 2 people: meets occupancy needs
Came to this listing on a recommendation and checked its ore-pass sorting floor figures ourselves. Nothing else about this listing stood out, which is what we wanted.
- JKJosip Kestrel★★★☆☆
2026-06-27This listing in a smaller operation: reliable for teaching settings
Have had this listing in service long enough to say something useful about this ore-pass sorting floor. Others may weigh it differently, but this listing suits us.
- LNLise Norrland★★★★☆
2026-06-24We looked at most of the ore-pass sorting floor listings before settling on this listing. The rest of this listing specification did not enter into the decision.
- WBWren Byrne★★★★☆
2026-06-18Second ore-pass sorting floor we have run; this listing replaced an older one. Setting this listing up went smoothly once we stopped guessing and read the sheet, reducing setup time by 30%. This listing is still the right call for us.




