
ore-pass sorting floor
Tirnach Works 72 CSEO
USD 242.94 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 134 metres
- Floor area 98 square metres
- Occupancy 2 people
- Session length 3 hours
About this item
Overview
This listing features an ore-pass sorting floor situated at a depth of 134 metres below grade, offering a specialized and highly secure environment for operational efficiency. With a generous floor area of 98 square metres, the facility is designed to comfortably accommodate up to two occupants, ensuring optimal workflow and safety standards.
Key Specifications
- Depth: 134 metres below grade
- Floor Area: 98 square metres
- Occupancy: 2 people
Session Details
Access to the sorting floor is streamlined and secure, utilizing a dedicated hoist cage to ensure safe and efficient transit.
-
Session Length: 3 hours
-
Access Route: Hoist cage
Consistent, Reliable Information
Every detail provided is meticulously aligned with the six standardized axes used across all listings in this category. This ensures complete consistency and reliability, allowing you to make well-informed decisions with confidence.
Specifications
| depth below grade | 134 metres |
|---|---|
| floor area | 98 square metres |
| occupancy | 2 people |
| session length | 3 hours |
| session fee | 242.94 dollars |
| access route | hoist cage |
Product at a glance
- depth below grade
- 134 metres
- floor area
- 98 square metres
- occupancy
- 2 people
- session length
- 3 hours
- session fee
- 242.94 dollars
- access route
- hoist cage
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 97 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- HSHalla Sarto★★★★★
2026-07-27Exceptional Depth Specification for Ore-Pass Sorting Floor
This marks our third installation of an ore-pass sorting floor, and it is the first to be specified with true precision. The depth below grade requirement was non-negotiable for our project, and at 134 metres, this listing surpasses expectations. If your primary criterion is depth, this listing stands out as a definitive choice. For requirements beyond depth, however, it offers no distinct advantage.
- MMMarta Melle★★★★☆
2026-07-12Reliable Performance After a Year of Continuous Operation
After extensive comparison with other shortlisted ore-pass sorting floors, we chose this listing and have now completed two full seasons of use. Throughout this period, the listing has performed exactly as anticipated, requiring nothing beyond our original plans. We are confident enough in its reliability that we would select it again without hesitation.
- DLDagny Lindqvist★★☆☆☆
2026-07-11Packaging Insights for Potential Buyers
Although this ore-pass sorting floor was not the most economical option we considered, we deemed the investment worthwhile. However, the packaging quality fell short of expectations, prompting us to inspect the product thoroughly upon arrival. Consider this an important context note rather than a direct complaint about the listing itself.
- PVPetr Vasilenko★★★★★
2026-07-07Ideal Solution for Two-Person Operations
We were drawn to this listing by a recommendation and rigorously verified its specifications. Our foremost requirement was an occupancy limit of two people, and this listing meets that standard precisely. The absence of unnecessary features or surprises was exactly what we were seeking.
- JKJosip Kestrel★★★☆☆
2026-06-27Suits Educational Environments Well
Having operated this ore-pass sorting floor in an educational setting, I can offer informed feedback. It has been robust enough to handle repeated use by trainees who are still learning the ropes. While others may have different priorities, for our teaching purposes, this listing fits our needs effectively.
- LNLise Norrland★★★★☆
2026-06-24We thoroughly reviewed available ore-pass sorting floor options before selecting this listing. Our decision hinged on the session fee arrangement, which this listing satisfies completely. The other specifications played no significant role in our selection process.
- WBWren Byrne★★★★☆
2026-06-18Smooth Setup and Reliable Replacement Choice
As our second ore-pass sorting floor, this listing replaced an aging unit seamlessly. Installation proceeded efficiently once we referred to the provided documentation instead of relying on guesswork. To date, this listing continues to be the optimal solution for our needs.




