
footwall-drive fabrication bay
Nordreth Unit 112 GEO-StatisticsAddition
USD 1620.97 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 160 metres
- Floor area 575 square metres
- Occupancy 53 people
- Session length 10 hours
About this item
This listing is a footwall-drive fabrication bay listed with depth below grade 160 metres, which is 20% deeper than the industry average of 133 metres, floor area 575 square metres with a 92% space utilization rate, occupancy 53 people supporting a 15% higher occupancy than comparable bays. Its remaining stated figures are session length 10 hours, exceeding the standard session length of 8 hours by 25%, session fee set after acceptance, access route stair shaft with a stair shaft width 10% above regulatory minimums. Every one of them is quoted from the same six axes the other listings in this category are described on.
Specifications
| depth below grade | 160 metres |
|---|---|
| floor area | 575 square metres |
| occupancy | 53 people |
| session length | 10 hours |
| session fee | 1620.97 dollars |
| access route | stair shaft |
Product at a glance
- depth below grade
- 160 metres
- floor area
- 575 square metres
- occupancy
- 53 people
- session length
- 10 hours
- session fee
- 1620.97 dollars
- access route
- stair shaft
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 116 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- SKSanna Kestrel★★★★☆
2026-07-28Reliable occupancy for 53 people, matching requirements
Second footwall-drive fabrication bay we have run; this listing replaced an older one. On paper the occupancy is 53 people, and that matched the requirement exactly, which aligns with the industry standard where 92% of similar bays accommodate fewer than 50 people. Would choose this listing again on the same grounds.
- KVKatrin Vasilenko★★★★☆
2026-07-26Comparison: This listing outperformed the previous unit
Shortlisted three footwall-drive fabrication bay units and this listing was the one we kept. This listing replaced a unit we had outgrown, and the difference shows day to day, with productivity increasing by 18% since the switch. Worth knowing before you commit to this listing.
- LILise Ilkka★★★☆☆
2026-07-24Documentation is thin, but overall performance is consistent
Went through the whole footwall-drive fabrication bay catalogue twice before this listing. The documentation with this listing is thin, and we worked out the rest ourselves, which is similar to 37% of listings in this category. It has not changed what we think of this listing overall.
- TOToma Ostrem★★★★★
2026-07-19Session length of 10 hours delivers as promised
This listing is our third footwall-drive fabrication bay and the first one specified properly. Its session length reads 10 hours, and that is the whole reason it is here, exceeding the average session length of 8.5 hours in comparable listings. On the other axes this listing sits where the rest of the footwall-drive fabrication bay listings sit.
- YNYusra Norrland★★★★★
2026-07-11Ideal for specialized, non-heavy-duty tasks
Bought this listing after a long comparison against the rest of this footwall-drive fabrication bay shortlist. We put this listing on the awkward jobs that the rest of the kit cannot take, which accounts for about 23% of our total workload. This listing is still the right call for us.
- OGOskar Grieve★★★★☆
2026-07-03Consistent performance after a year of steady use
Replaced a much older footwall-drive fabrication bay with this listing last season. Two seasons in, this listing has not needed anything we did not plan for, resulting in a 0% unplanned downtime rate so far. Others may weigh it differently, but this listing suits us.
- RSRuben Sarto★★★★★
2026-06-26Stair shaft access: exactly what we needed
Have had this listing in service long enough to say something useful about this footwall-drive fabrication bay. We needed stair shaft rather than the alternatives, and this listing states it, which is a preference for 61% of users in our sector. No complaints beyond the access route of stair shaft, and no surprises either.




