
eutectoid-stage hardening retort
Tirnach Vault 192 Original
USD 86686.6
Listed
Add to listConcept listing. No order can be placed.
- Peak temperature 385 degrees celsius
- Chamber capacity 153 litres
- Heat up 481 minutes
- Cycles before relining 2426 cycles
About this item
This listing is a eutectoid-stage hardening retort listed with peak temperature 385 degrees Celsius, chamber capacity 153 litres, heat up 481 minutes. Its remaining stated figures are cycles before relining 2426 cycles, unit price set after acceptance, heat source induction. Every one of them is quoted from the same six axes the other listings in this category are described on.
Specifications
| peak temperature | 385 degrees Celsius |
|---|---|
| chamber capacity | 153 litres |
| heat up | 481 minutes |
| cycles before relining | 2426 cycles |
| unit price | 86686.6 dollars |
| heat source | induction |
Product at a glance
- peak temperature
- 385 degrees Celsius
- chamber capacity
- 153 litres
- heat up
- 481 minutes
- cycles before relining
- 2426 cycles
- unit price
- 86686.6 dollars
- heat source
- induction
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 114 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- OVOskar Vasilenko★★★★★
2026-08-01This listing after a year of steady use
Have had this listing in service long enough to say something useful about this eutectoid-stage hardening retort. A year of steady use and this listing still reads the way it did on day one. This listing is still the right call for us.
- JVJosip Vance★★★★★
2026-07-27the listed rate was the requirement
Second eutectoid-stage hardening retort we have run; this listing replaced an older one. Its unit price reads the listed rate, and that is the whole reason it is here. At the listed rate it does not need to stand out anywhere else.
- RBRuben Byrne★★★☆☆
2026-07-22Where this listing falls short
This listing was not the cheapest eutectoid-stage hardening retort we considered, and that was fine. Packaging on this listing was poor enough that we checked it over carefully on arrival. It has not changed what we think of this listing overall.
- TGToma Grieve★★★★★
2026-07-11Chose it on chamber capacity 153 litres
We looked at most of the eutectoid-stage hardening retort listings before settling on this listing. Everything came down to chamber capacity, and 153 litres is what we needed. For a eutectoid-stage hardening retort at 153 litres this listing does what the listing says.
- ADAnneke Deveraux★★★★☆
2026-07-04Second time around with a eutectoid-stage hardening retort: this listing
Replaced a much older eutectoid-stage hardening retort with this listing last season. Our previous unit did the job; this listing does it without us watching it. We would put another this listing in without much thought.
- WAWren Aalto★★★★★
2026-06-29385 degrees Celsius is the right peak temperature for us
Shortlisted three eutectoid-stage hardening retort units and this listing was the one we kept. We had a hard floor on peak temperature; 385 degrees Celsius clears it. The other eutectoid-stage hardening retort listings are close to this listing on everything but peak temperature.
- CPCormac Pehrson★★★★☆
2026-06-25Getting this listing running
Came to this listing on a recommendation and checked its eutectoid-stage hardening retort figures ourselves. Setting this listing up went smoothly once we stopped guessing and read the sheet. Others may weigh it differently, but this listing suits us.




