
adit-entry survey chamber
Drovane Vault 118 CSEO
USD 1535.59 per session
Listed
Add to listConcept listing. No order can be placed.
- Depth below grade 105 metres
- Floor area 270 square metres
- Occupancy 33 people
- Session length 9 hours
About this item
Overview
This listing features a premier adit-entry survey chamber meticulously documented across all six key evaluation axes, ensuring consistency and reliability of information with other offerings in its category.
Key Specifications
-
Depth Below Grade: The chamber is situated at an impressive depth of 105 metres, providing optimal environmental control and security.
-
Floor Area: With a generous 270 square metres of floor space, it easily accommodates a variety of operational needs.
-
Occupancy: Designed for efficiency and safety, the chamber supports a maximum occupancy of 33 individuals, making it ideal for medium-sized teams.
-
Session Length: Each session extends up to 9 hours, enabling sustained, productive work without interruption.
-
Access Route: Seamless access is assured via a vehicle ramp, facilitating smooth logistics and equipment transport.
Consistency and Reliability
All figures stated above are sourced directly from the same six standardized axes used to evaluate every listing in this category. This ensures absolute transparency and comparability across options, positioning this survey chamber as a benchmark in its field.
Specifications
| depth below grade | 105 metres |
|---|---|
| floor area | 270 square metres |
| occupancy | 33 people |
| session length | 9 hours |
| session fee | 1535.59 dollars |
| access route | vehicle ramp |
Product at a glance
- depth below grade
- 105 metres
- floor area
- 270 square metres
- occupancy
- 33 people
- session length
- 9 hours
- session fee
- 1535.59 dollars
- access route
- vehicle ramp
At a glance · Stated specifications for this listing.
Owner feedback
Showing the 7 most recent of 106 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
- AIAnneke Ilkka★★★★☆
2026-07-28Returning to the Adit-Entry Survey Chamber: This Listing Delivers
After extensively evaluating various adit-entry survey chamber listings, we chose this particular option. Transitioning from a different manufacturer, we found this listing required significantly less adjustment to achieve optimal performance. Prospective buyers should be aware of this advantage before making their final decision.
- TOToma Ostrem★★★★☆
2026-07-18A Practical Choice for Single-Site Operations
Although this adit-entry survey chamber was not the most budget-friendly option available, its value is evident. We operate this listing at a single site rather than across multiple locations, and it aligns perfectly with our operational needs. Given our positive experience, we would confidently select this listing again without hesitation.
- TVTeodor Vasilenko★★★★☆
2026-07-15Vehicle Ramp Access: This Listing Meets the Critical Requirement
After an in-depth comparison of adit-entry survey chamber options, we selected this listing specifically for its vehicle ramp access—our foremost requirement. Once we confirmed this feature, the other specifications became secondary.
- IMIlva Melle★★★★★
2026-07-14Session Length of 9 Hours: Exactly as Advertised
We thoroughly reviewed the entire adit-entry survey chamber catalogue before settling on this listing. Our primary need was a session length of approximately 9 hours, and this listing delivers precisely that.
- LGLise Grieve★★★★☆
2026-07-10Continued Satisfaction with This Listing
Having utilized this adit-entry survey chamber for two full seasons, we are confident in its reliability. The listing has required only standard maintenance, with no unexpected issues arising. While others may have different priorities, this product consistently meets our requirements and expectations.
- SPSanna Pehrson★★★★★
2026-07-01Depth Below Grade: Accurate at 105 Metres
We were referred to this adit-entry survey chamber and thoroughly verified its specifications.
- PSPetr Sarto★★★☆☆
2026-06-23A Well-Specified Chamber with Room for Documentation Improvement
This is our third adit-entry survey chamber, and it is the first to be properly specified for our needs. However, the accompanying documentation was insufficient, requiring us to independently address several details. Prospective buyers should be aware of this limitation before committing to this listing.




